Some extra information
Martec Engineering
Martec Engineering
0141 646 5220
Search
Premier Vision Doors
Premier Vision Door

The Communal Entrance for the 21st Century

Tested to Secured by Design, STS202 level 2

  • A total solution, including screens and a fully operational door entry system
  • Complies with EN179 for escape routes
  • Up to 15 years warranty on PPC finish

Martec Engineering are delighted to provide our Communal Security Doors to the NBS National BIM Library. Specifiers, simply click here to view.


Design

Fully designed in-house by Martec, the Premier Vision Door is covered by our £10m PI insurance, giving total peace of mind to specifiers and end users.

Door

Constructed from fully welded, thermally broken steel section, the strength and thermal performance of the Premier Vision Door is industry leading.

Glazing

The specialist glass, using laminated interlayers allows the discerning customers an unlimited choice of glazing configurations while still providing the security required in flatted developments.

Lock

A strong, safe, user friendly alternative to magnetic locks. The three point lock is fully consistent with door entry but is also EN179 compliant for escape routes. It does not require a constant electrical current to hold locked, meaning it is less expensive to run.

Finish

Polyester powder coated to a strict process to minimize weathering, Martec can offer a warranty for up to 15 years.

Thermal Performance

Offering a U-value of 1.6 Um2k. The Premier Vision Door provides an energy efficient alternative to other communal doors available.

Door Entry

Fully tested to STS level 2 in conjunction with the Premier Vision door, the door entry system can be taken as an optional extra with the reassurance that one Secured by Design Certificate covers the whole entrance.

 

Get in touch

Client Spotlight
Cube Housing Association Ltd

Martec Engineering successfully tendered for Cube Housing Association Ltd to breath new life into the council flats at 171-191 Wyndford Road Glasgow.

Working with Collective Architecture from their design proposals we took full control of the construction phase of the project.

Cube Housing Association Ltd